Petrochemical
Continuous process plants, where an hour offline is the expensive number.
Petrochemical
Change on a plant that runs continuously.
A petrochemical unit is not designed to be stopped. That single fact governs how any instrumentation or control work has to be approached: staged, reversible at every step, and tested somewhere other than the running plant.
We build and test replacement systems against a simulated process before they reach site, so the work inside the window is termination and proving rather than discovery. When a tie-in has to happen hot, the method is agreed and accepted long before the day.
At a glance
- Control system migration staged around continuous operation
- Safety instrumented systems and alarm rationalisation
- Analytical measurement and sampling system design
- Factory acceptance testing against a simulated process
- Reversible cut-over with a written back-out plan

Typical scope
What we are asked to do.
-
01
DCS migration
Moving off an unsupported platform in stages, each one provable and reversible.
-
02
Analytical systems
Analysers, analyser shelters and the sampling systems that feed them — usually the harder half.
-
03
Safety case support
SIS implementation, proof testing and the records that keep the case current.
-
04
Alarm rationalisation
Reducing an alarm flood to a set an operator can actually act on.
-
05
Panel replacement
Like-for-like marshalling and control panels built and tested off site.
-
06
Reliability investigation
Finding the cause of a recurring trip instead of resetting it faster.
HAZCO delivered our instrumentation upgrade safely and on schedule, with a field team that understood the process as well as the hardware.

Start a conversation
Tell us about your project.
What you need, when you need it and what is already in place. Our engineers will come back with a considered answer, not a brochure.
- Call
- +966 13 883 3990
- Write
- info@hazco.com.sa