Construction & Fabrication

Panels and skids built to drawing and tested before they reach site, then installed and proven.

Construction

Built to drawing, tested, then installed.

We take responsibility for the fabrication package as well as the installation: drawings issued, build inspected, and every panel tested against a simulated plant before it is put on a truck.

On site, the same project team carries the equipment through installation and commissioning — which removes the most expensive conversation on any project: whose fault the interface is.

At a glance

  • Control, marshalling and power panel fabrication
  • Instrument, metering and analyser skid assembly
  • Factory acceptance testing before shipment
  • E&I construction on live and brownfield sites
  • Permit-to-work discipline and toolbox briefings on every shift
Silhouetted tower cranes against a dramatic sunset sky

Capability

What the fabrication and site work cover.

  1. 01

    Panel fabrication

    Control, marshalling, MCC and distribution panels to drawing, wired and labelled.

  2. 02

    Skid assembly

    Instrument, sampling and metering skids assembled and pressure tested as a unit.

  3. 03

    Factory testing

    FAT against a simulated process, witnessed, with the punch list closed before shipment.

  4. 04

    Site installation

    Containment, cabling, terminations and field device mounting on operating plant.

  5. 05

    Working live

    Permit discipline, isolation, gas testing and the briefing before anyone goes through a gate.

  6. 06

    Records

    Material traceability, test records and the as-built mark-up as work proceeds.

Start a conversation

Tell us about your project.

What you need, when you need it and what is already in place. Our engineers will come back with a considered answer, not a brochure.

Call
+966 13 883 3990
Write
info@hazco.com.sa
Visit
Dammam, Eastern Province