Automation & Control System

DCS, PLC and SCADA integration, safety systems, and migrations that do not cost a production day.

Automation

Changing a control system on a plant that cannot stop.

Replacing a control system is rarely a technical problem. It is a sequencing problem: what has to be cut over, in what order, inside how many hours, with what written back-out plan if the fourth step fails.

As system integrators for Siemens, Rockwell Automation, Schneider Electric and AVEVA, we plan migrations backwards from the shutdown window you actually have. Panels are built and fully tested against a simulated plant before they are shipped, so the work on site is termination and proving rather than discovery.

At a glance

  • DCS, PLC and SCADA configuration and integration
  • Safety instrumented systems, with SIL verification
  • Control panel design, build and like-for-like migration
  • Factory acceptance testing against a simulated process
  • Written cut-over sequence and back-out plan for every tie-in
Row of rack servers lit in blue in a data centre

Scope

Where we are usually brought in.

  1. 01

    System integration

    DCS, PLC and SCADA across vendors, including the interfaces nobody wants to own.

  2. 02

    Safety instrumented systems

    SIS design and implementation with SIL verification and proof-test procedures.

  3. 03

    Panel design & migration

    New panels, retrofits and like-for-like swaps engineered for the available window.

  4. 04

    Revamps & obsolescence

    A staged path off a platform that is no longer supported, without a single big-bang weekend.

  5. 05

    Operator interface

    Graphics and alarm rationalisation, so the screen tells an operator what to do next.

  6. 06

    Telemetry & remote sites

    Linking unmanned assets back to a control room over whatever path is available.

Migration

How a migration is sequenced.

The order matters more than the hardware.

  1. 01

    Capture

    Audit the existing system, I/O, logic and every undocumented change made since it was built.

  2. 02

    Simulate

    Build the replacement and test it against a simulated plant until it behaves correctly.

  3. 03

    Cut over

    Execute the written sequence inside the window, with the back-out plan ready at every step.

  4. 04

    Prove

    Loop check, functional test, operator sign-off and the as-built document set.

Their automation engineers migrated our control system with zero unplanned downtime. Professional, certified and responsive throughout.

Project Director

Start a conversation

Tell us about your project.

What you need, when you need it and what is already in place. Our engineers will come back with a considered answer, not a brochure.

Call
+966 13 883 3990
Write
info@hazco.com.sa
Visit
Dammam, Eastern Province